Name:
NR NR/L3/SIG/10665 ISSUE 20 PDF
Published Date:
09/04/2021
Status:
[ Revised ]
Publisher:
Network Rail
This document covers the conditions required to allow the transition from the default maintenance regime to a Reliability-Centred Maintenance regime for signalling equipment.
This document applies to:
a) Section Managers(Signals).
b) Signal and Telecoms Maintenance Engineers.
c) Route Engineer [Signalling], Principal Route Engineer [Signalling] or equivalent.
Purpose
This document contains the prerequisites, allowing Reliability-Centred Maintenance to be implemented on signalling equipment as an alternative to the default maintenance regime.
| Edition : | 20 |
| File Size : | 1 file , 730 KB |
| Number of Pages : | 43 |
| Published : | 09/04/2021 |