NR NR/SIG/10665/MOD 035 ISSUE 1 PDF

NR NR/SIG/10665/MOD 035 ISSUE 1 PDF

Name:
NR NR/SIG/10665/MOD 035 ISSUE 1 PDF

Published Date:
12/07/2013

Status:
[ Withdrawn ]

Description:

Reliability Centred Maintenance of Signalling Equipment (ROSE) - High Voltage Impulse (HVI) Track Circuit Equipment (NR/ROSE/TC-A5/1)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

General

The objective of the track circuit examination is to find and remove potential causes of track circuit failure. The extent of the examination will be dependant on:

i. The type and complexity of track layout.

ii. The amount of bonding.

iii Jointed track or Continuous Welded Rail.

iv. Steel, wooden or concrete sleepers.


Edition : 1
File Size : 1 file , 260 KB
Number of Pages : 10
Published : 12/07/2013

History


Related products

NR BRS-SM 861/4 ISSUE C
Published Date: 09/16/1988
Apparatus Case Small Side Panel RH for Side Panel Assembly
$5.7
NR E10000/8/2 ISSUE A
Published Date: 06/24/1993
MES Panels - Circuits (1)
$5.7
NR NR/L2/CTM/012/030 ISSUE 1
Published Date: 03/06/2010
SIG 30: Install and Configure Axle Counters
$5.7
NR NR/L2/CTM/012/044 ISSUE 1
Published Date: 03/06/2010
SMTH: Confirm that Signalling Systems Have Been Tested to Signal Maintenance Testing Handbook Requirements Following Maintenance /Defect Repair or Renewal
$13.2

Best-Selling Products