NR NR/SIN/169 ISSUE 3 PDF

NR NR/SIN/169 ISSUE 3 PDF

Name:
NR NR/SIN/169 ISSUE 3 PDF

Published Date:
06/26/2020

Status:
[ Active ]

Description:

VT1 Type Relays Inspection

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This SIN applies to all VT1 relays. The requirements apply to all Signal Engineering functions that maintain, install or commission this type of relay on NR infrastructure.

The requirements also apply to organisations that handle relays serviced by Unipart Rail Crewe (formerly NRS Crewe) and Siemens Mobility Limited (formerly

Westinghouse).

Purpose

The purpose of this Special Inspection Notice (SIN) is to:

a) inspect the vane front-stop assemblies of all VT1 style relays;

b) inspect all the slipper stop and vane stop-plates;

c) replace all the track circuit stabiliser units manufactured by NRS;

d) replace any relays deemed to be defective.


Edition : 3
File Size : 2 files , 1.9 MB
Number of Pages : 20
Published : 06/26/2020

History

NR NR/SIN/169 ISSUE 3
Published Date: 06/26/2020
VT1 Type Relays Inspection
$13.2
NR NR/SIN/169 ISSUE 2
Published Date: 01/14/2019
VT1 Type Relays Inspection
$13.2

Related products

NR TWI 3S082 ISSUE 1
Published Date: 03/01/2005
How to Replace a Soleplate
$5.7
NR NR/L3/MTC/II0219/02 ISSUE 4
Published Date: 06/03/2023
Management of Alerts and Alarms from Remote Condition Monitoring
$13.2
NR NR/SIN/084 ISSUE 2
Published Date: 08/26/2008
Life Management of Polycarbonate Lenses
$7.5
NR NR/CIV/SD/2146-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Right Skew 30º
$5.7

Best-Selling Products