NR NR/SIN/188 ISSUE 1 PDF

NR NR/SIN/188 ISSUE 1 PDF

Name:
NR NR/SIN/188 ISSUE 1 PDF

Published Date:
03/11/2019

Status:
[ Active ]

Description:

Removal of Howells BR985 (Mk2) Re-Engineered Hydraulic Level Crossing Barrier Packs

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This SIN applies to all BR843 level crossing barrier cabinets fitted with Howells BR985 (Mk2) re-engineered hydraulic level crossing barrier packs (Cat No. R086/027184).

Purpose

The purpose of this Special Inspection Notice (SIN) is to instruct the removal of Howells BR985 (Mk2) re-engineered hydraulic level crossing barrier packs (Cat No. R086/027184) from Network Rail managed infrastructure and install a replacement using SPX BR985 (Mk2) hydraulic level crossing barrier packs (Cat No. 086/027218 or R086/027218)


Edition : 1
File Size : 1 file , 320 KB
Number of Pages : 7
Published : 03/11/2019

History


Related products

NR NR/PRC/MPI/CI0010 ISSUE 1
Published Date: 04/03/2006
Procedure for Categorisation and Acceptance of Method Statements for MP&I "Civils" Works
$7.5
NR X00080 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Typical Track Circuit Schematic (1)
$5.7
NR NR/L2/SIG/30014/A050 ISSUE 1
Published Date: 06/04/2022
Signalling Works Testing: Application of V&V Processes under Signalling Works Testing
$18.6
NR RT/E/C/19269 ISSUE 1
Published Date: 12/01/2002
Signalling Equipment Workshop Engineering Notice (SIGWEN018) - GEC FDM Reed Equipment (aka NR/GN/SIG/19269)
$7.5

Best-Selling Products