NR NR/SIN/189 ISSUE 1 PDF

NR NR/SIN/189 ISSUE 1 PDF

Name:
NR NR/SIN/189 ISSUE 1 PDF

Published Date:
03/06/2020

Status:
[ Withdrawn ]

Description:

DC Frame Leakage Protection

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

All first and second generation metal clad DC Traction switchboards (see section 4 for definition) on Network Rail managed infrastructure within the following Regions:

- Southern

- Eastern

- North West & Central (NW&C)

Purpose

The purpose of this Special Inspection Notice (SIN) is to confirm the operational status of DC Frame leakage systems on both first and second generation metal clad DC traction switchboards and to address any deficiencies found.


Edition : 1
File Size : 1 file , 340 KB
Number of Pages : 16
Published : 03/06/2020

History


Related products

NR NR/L3/ELP/27240/NR/DIST C26L ISSUE 1
Published Date: 12/05/2020
Routine Testing of D.C. Frame Leakage Protection - Whipp & Bourne MM74
$7.5
NR NR/L2/SIG/11201/MOD A2-9 ISSUE 2
Published Date: 12/03/2022
Signalling Design Handbook: Functionally Equivalent Design
$18.6
NR E10007/06 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region Preferred and Non - Preferred URs Using Signalling Relays for Delay
$5.7
NR NR/L3/OCS/044/FS-39B ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Station Security Plan - Restricted - Station Security Committee
$5.7

Best-Selling Products

279167 SPECS/LOADS
Published Date: 01/01/2006
Testing