NR NR/SP/ELP/27195 ISSUE 2 PDF

NR NR/SP/ELP/27195 ISSUE 2 PDF

Name:
NR NR/SP/ELP/27195 ISSUE 2 PDF

Published Date:
02/01/2006

Status:
[ Active ]

Description:

Earthing and bonding at North Pole International depot

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-sp-elp-27195-issue-2_2772856

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

Purpose

This Earthing and Bonding specification is unique to the North Pole Depot area and the section of the West London Lines between West Way and Mitre Bridge Junction, it should be read in conjunction with NR/SP/ELP/21085 which contains general information regarding standard bonding practices, cable sizes, use of spider plates etc.

There are 3 different types of electrification within the North Pole International Depot complex :

25kV 50Hz a.c. Overhead Line Conductor System

660V d.c. 3rd Rail Conductor System

3,000V d.c. Overhead Line Conductor System

Bonding areas

There are, in vary degrees, both a.c. and d.c. traction return current circulating around the depot complex, and to identify the special earthing and bonding requirements for various parts of the complex, the depot has been sub-divided into the following areas :-

The area where the connections between the traction earth return system and the running rails have been specifically located to minimise the possible effects of the d.c. circulating current in the earth conductors.

The area with no special provision for d.c. circulating currents and where the traction earthing requirements will be arranged in accordance with NR/SP/ELP/21085.

Drawing No.1 depicting these areas is appended (Appendix "A") to this specification.


Edition : 2
File Size : 1 file , 220 KB
Number of Pages : 21
Published : 02/01/2006

History


Related products

NR NR/L3/OHS/005/10 ISSUE 1
Published Date: 03/05/2022
Design and Construction Management in a High Street Environment: System Definition for Electricity Meter Installed in Office Building
13.20 €
NR NR/L2/CIV/005/07 ISSUE 1
Published Date: 06/02/2018
Drainage Systems Manual: Drainage Intervention
18.60 €
NR BRS-SM 610 ISSUE B
Published Date: 10/07/1980
Post Mounted Signs Lamp Support Straight for 88.9 Diameter Post
5.70 €
NR NR/CIV/SD/2032 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m Internal Unit Left Skew 15°
5.70 €

Best-Selling Products

FDA 21 CFR PART 1020
Published Date: 04/01/2020
PERFORMANCE STANDARDS FOR IONIZING RADIATION EMITTING PRODUCTS
12.90 €
FDA 21 CFR PART 1020
Published Date: 04/01/2019
PERFORMANCE STANDARDS FOR IONIZING RADIATION EMITTING PRODUCTS
12.90 €
FDA 21 CFR PART 1020
Published Date: 04/01/2016
PERFORMANCE STANDARDS FOR IONIZING RADIATION EMITTING PRODUCTS
12.90 €
FDA 21 CFR PART 1020
Published Date: 04/01/2021
PERFORMANCE STANDARDS FOR IONIZING RADIATION EMITTING PRODUCTS
12.90 €
FDA 21 CFR PART 1040
Published Date: 04/01/2021
PERFORMANCE STANDARDS FOR LIGHT-EMITTING PRODUCTS
11.40 €
FDA 21 CFR PART 111
Published Date: 04/01/2020
CURRENT GOOD MANUFACTURING PRACTICE IN MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS
12.60 €