NR NR/WI/ELP/27096 ISSUE 2 PDF

NR NR/WI/ELP/27096 ISSUE 2 PDF

Name:
NR NR/WI/ELP/27096 ISSUE 2 PDF

Published Date:
12/01/2005

Status:
[ Active ]

Description:

Work Instruction for Production of Mean and Peak Current Profiles for 25 kV A.C. Electrification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This instruction sets out the methods of producing mean and peak current profiles, and the assumptions which have been made for the calculation.

Factors based on test results are included on both of the profiles to enable an assessment to be made of the current in any one track.

The instruction gives a method for producing profiles of mean and peak currents.

This instruction assumes that the traffic is typical of suburban and mixed traffic main line situations. Further consideration should be given on heavily loaded sections where the division of currents between tracks may differ from the typical factors.

This instruction does NOT cover the 25-0-25 kV autotransformer electrification system.

Purpose

Profiles of predicted mean and peak currents flowing in the overhead line are used by the Electrical Distribution Engineer to determine the rating of electrical equipment and by the Signalling and Telecommunications Engineer for electromagnetic interference studies.

The purpose of this document is to set out the methods followed when producing mean and peak current profiles for the 25 kV ac, 50 Hz overhead line electrification system.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 14
Published : 12/01/2005

History


Related products

NR BRS-SE 41
Published Date: 11/04/1959
Electro-Magnetic-Indicator Base
$5.7
NR NR/L2/TEL/31200 ISSUE 1
Published Date: 12/04/2021
Design of High-Capacity Fibre Cable Systems
$18.6
NR NR/L2/CTM/012/027 ISSUE 1
Published Date: 03/06/2010
Sig 27: Assemble system and sub system component parts
$5.7
NR NR/L3/OPS/045/2.25 ISSUE 1
Published Date: 01/08/2022
National Operating Procedure (NOP) 2.25: Rest Break Management Process
$13.2

Best-Selling Products