Name:
NR RT/E/P/11654 ISSUE 1 PDF
Published Date:
10/01/1999
Status:
[ Inactive ]
Publisher:
Network Rail
The scope of this procedure is the management of insulation degradation in signalling wires and cables of all types, including trackside multi-core cables.
PURPOSE
The purpose of this procedure is to set high-level responsibilities for the management of signalling wire insulation degradation.
| Edition : | 1 |
| File Size : | 1 file , 200 KB |
| Number of Pages : | 10 |
| Published : | 10/01/1999 |