NR RT/LS/P/026 ISSUE 2 PDF

NR RT/LS/P/026 ISSUE 2 PDF

Name:
NR RT/LS/P/026 ISSUE 2 PDF

Published Date:
06/01/2002

Status:
[ Inactive ]

Description:

Inspection & Risk Assessment Methodology for User-Worked, Footpath & Bridleway Level Crossings (aka NR/SP/OPS/026)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This procedure shall be applied to all user-worked, footpath and bridleway level crossings on Railtrack controlled infrastructure.

Purpose 

To enable the determination of reasonably practicable controls of safety risks at user-worked level crossings (UWC) including those fitted with miniature warning lights, and at footpath and bridleway level crossings on Railtrack infrastructure.

To ensure that the controls are documented and maintained, and hence compliance to the Management of Health & Safety at Work Regulations 1999 demonstrated.

To mandate inspection forms for completion at these types of level crossings, which will then support the risk assessment. The bridleway inspection form is also to be used to record inspections of footpath level crossings.


Edition : 2
File Size : 1 file , 130 KB
Number of Pages : 14
Published : 06/01/2002

History

NR RT/LS/P/026 ISSUE 2
Published Date: 06/01/2002
Inspection & Risk Assessment Methodology for User-Worked, Footpath & Bridleway Level Crossings (aka NR/SP/OPS/026)
$13.2
NR RT/LS/P/026 ISSUE 1
Published Date: 12/01/1998
Inspection & Risk Assessment Methodology UWC & Bridleway Level Crossings (aka NR/SP/OPS/026)
$13.2

Related products

NR BRS-ST 82/31
Published Date:
Label Terminations (1-10) (11-20) (21-30) (31-40) Lifting Barrier (Auto) MK II B
$5.7
NR NR/L2/OHS/032 ISSUE 3
Published Date: 09/04/2021
Training, Competence and Assessment in Accident and Incident Investigation
$13.2
NR NR/L3/ELP/25000/MODG ISSUE 1
Published Date: 09/07/2019
Electrical Safety Measures for Working on the Operational Railway with Overhead Electrification (Trial Areas Only): Introduction to Overhead Line Equipment
$7.5
NR NB 193 ISSUE 2
Published Date: 05/26/2021
Collis Hinged Signal Post Checks and Operation Procedure
$7.5

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants