NR SSI8500I ISSUE 7 PDF

NR SSI8500I ISSUE 7 PDF

Name:
NR SSI8500I ISSUE 7 PDF

Published Date:
09/05/2015

Status:
[ Revised ]

Description:

Design of SSI Schemes - Chapter I: Equipment Procurement and Specifications

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Purpose

As a result of the original agreement between the British Railways Board, GEC General Signal (now ALSTOM) and Westinghouse Brake and Signal (Now Westinghouse Rail Systems), SSI equipment. manufactured by them is generally interchangeable at the modular level. The exception to this rule is when the Interlocking MPMs, and MMs, are of the 2MHz variety; in this case the replacement module shall be from the same manufacturer as the failed module. Note that specification and catalogue numbers are correct at the time of issue but may not always be maintained up-to-date.


Edition : 7
File Size : 1 file , 290 KB
Number of Pages : 15
Published : 09/05/2015

History

NR SSI8500I ISSUE 8
Published Date: 12/04/2021
Design of SSI Schemes - Chapter I: Equipment Procurement and Specifications
$13.2
NR SSI8500I ISSUE 7
Published Date: 09/05/2015
Design of SSI Schemes - Chapter I: Equipment Procurement and Specifications
$13.2

Related products

NR NR/L3/MTC/RCS0216/OT20 ISSUE 1
Published Date: 03/03/2012
Risk Control Manual: Access Improvement using Tarmac
$5.7
NR NR/L3/TEL/30181/023 ISSUE 1
Published Date: 12/05/2020
Telecoms Maintenance Work Instructions Handbook: Maintenance of Public Address Personal Computer (PC) and Recorded Announcement Equipment
$5.7
NR NR/L2/SIG/11774 ISSUE 6
Published Date: 03/02/2024
Clamp Lock Handbook
$18.6
NR RT/E/WI/00105 ISSUE 2
Published Date: 08/01/2004
AzLM Axle Counter System Risk Based Maintenance (aka NR/WI/SIG/00105)
$18.6

Best-Selling Products

Impact & Blast Loading of Concrete
Published Date: 06/01/1990