Name:
NR SSIDIS137 ISSUE 3 PDF
Published Date:
03/21/2007
Status:
[ Active ]
Publisher:
Network Rail
PURPOSE OF PAPER
The purpose of this paper is to obtain approval from SSISPG for the data intended to control directional interlocking of bidirectional sections on the Trent Valley Four Track, Colchester-Clacton and other resignalling schemes.
This paper does not cover operation by ARS, or where signals are relaycontrolled from an SSI.
| Edition : | 3 |
| File Size : | 1 file , 51 KB |
| Number of Pages : | 14 |
| Published : | 03/21/2007 |