Name:
NR SSIDIS183 ISSUE 1 PDF
Published Date:
09/18/2013
Status:
[ Active ]
Publisher:
Network Rail
PURPOSE
The purpose of this paper is to gain SSIAG approval of the data constructs and application for Over-run detection to be provided at TVSC for the Reading Outer Relock & Immunisation, Berks & Hants Scheme.
The Network Rail Signalling Route Asset Manager & Operations Representative have both been consulted on this application, including the non provision of an Inhibit Timer or Flashing Inhibit Indication as a reminder to the Signaller and have fully endorsed the proposed application for this non provision.
| Edition : | 1 |
| File Size : | 1 file , 130 KB |
| Number of Pages : | 7 |
| Published : | 09/18/2013 |