NR SSIDIS183 ISSUE 1 PDF

NR SSIDIS183 ISSUE 1 PDF

Name:
NR SSIDIS183 ISSUE 1 PDF

Published Date:
09/18/2013

Status:
[ Active ]

Description:

Implementation of Overrun Detection and Management for IECC

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

PURPOSE

The purpose of this paper is to gain SSIAG approval of the data constructs and application for Over-run detection to be provided at TVSC for the Reading Outer Relock & Immunisation, Berks & Hants Scheme.

The Network Rail Signalling Route Asset Manager & Operations Representative have both been consulted on this application, including the non provision of an Inhibit Timer or Flashing Inhibit Indication as a reminder to the Signaller and have fully endorsed the proposed application for this non provision.


Edition : 1
File Size : 1 file , 130 KB
Number of Pages : 7
Published : 09/18/2013

History


Related products

NR NR/L3/CIV/151 ISSUE 8
Published Date: 09/07/2024
Application of Standard Designs and Details for Building and Civil Engineering Works
$18.6
NR TEF 3248 ISSUE 2
Published Date: 02/01/2015
Drainage Inspection Form
$5.7
NR NR/L2/SIG/11201/MOD B19 ISSUE 5
Published Date: 06/02/2018
Signalling Design Handbook: Signals - Relay Circuits
$13.2
NR BRS-SM 2424 ISSUE A
Published Date: 01/12/1994
SGE "EP" Point Machine Fittings Switch Extension Pieces for UIC-54B Plain Leads
$5.7

Best-Selling Products

AI IS-180
Published Date:
Safe Storage & Handling of Hot Asphalt
AI MS-01
Published Date: 1999
Thickness Design--Asphalt (Ninth Edition, Reprinted 1999)
AI MS-10
Published Date: 1997
Soils Manual - Fifth Edition
AI MS-11
Published Date:
Thickness Design - Asphalt Pavements for Air Carrier Airports - Third Edition
AI MS-12
Published Date: 1979
Asphalt Hydraulics - Second Edition
AI MS-16
Published Date: 2009
Asphalt in Pavement Preservation and Maintenance