NR TI 076 ISSUE 3 PDF

NR TI 076 ISSUE 3 PDF

Name:
NR TI 076 ISSUE 3 PDF

Published Date:
02/01/2008

Status:
[ Withdrawn ]

Description:

Action on finding defects that reduce the integrity of the fixed stretcher bar assembly on points

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This Technical Instruction applies to full-depth switches with fixed stretcher bar assemblies in facing and trailing configurations. It applies where broken, cracked, missing, loose or detached stretcher bars and associated brackets are identified during normal maintenance work or while undertaking the inspections mandated by NR/SIN 099 and NR/SIN 101.

Purpose

There is an inconsistency in the wording of the relevant section of NR/SP/SIG/19807, and NR/SMS/PF01 issue 5. Since the issue of TI 076 issue 2, the data from NR/SIN 099 has been reviewed and further inspection work has been initiated in SIN 101. Amended remedial actions, as defined in the enclosed action chart, can be implemented following the discovery of defects. This Technical Instruction mandates that staff undertaking work on the equipment identified in the scope shall observe the requirements of this instruction instead of the relevant sections of NR/SP/SIG/19807, NR/SMS/PF01 section 2.7 and TI 061 section 3. This issue supersedes issue 2 of TI 076. The requirements of TI 076 Issue 2 with regards to Adjustable Stretcher Bars have been transferred to TI 08x which will be issued shortly.


Edition : 3
File Size : 1 file , 310 KB
Number of Pages : 4
Published : 02/01/2008

History


Related products

NR NR/L2/ELP/27428/03 ISSUE 1
Published Date: 12/03/2016
Product Specification for National Procurement of OLE Components: 25kV A.C. Tensioning Devices for Railway Electrification Equipment
$18.6
NR RT/E/S/40047 ISSUE 3
Published Date: 08/01/2001
Maintenance of Points Heating Installations
$13.2
NR NR/L2/ELP/24001 ISSUE 5
Published Date: 08/26/2008
Specification for the Appointment, Training & Assessment of Persons Working on or Having Access to Electrical Power Supply Equipment
$18.6
NR NR/L3/OPS/045/4.16 ISSUE 5
Published Date: 07/01/2023
National Operating Procedure (NOP) 4.16: Person Struck by Train and Fatality Management
$7.5

Best-Selling Products

CGSB 1-GP-151M
Published Date: 03/01/1980
Standard for Coating, Interior, Intumescent, Fire Retardant
Free Download
CGSB 1-GP-151M
Published Date: 03/01/1980
Revetement de peinture, interieur, intumescent, ignifuge
Free Download
CGSB 1-GP-180MA
Published Date: 02/01/1996
Coating, Polyurethane, Two-Package, General Purpose
Free Download
CGSB 1-GP-180MA
Published Date: 02/01/1996
Revetement de polyurethanne, a deux constituants separes, pour utilisation generale
Free Download
CGSB 1-GP-191M AMEND.
Published Date: 03/01/1981
Enamel, Automotive Refinishing, Fast Drying, Gloss
CGSB 1-GP-191M AMEND.
Published Date: 03/01/1981
Peinture-email brillante, a sechage rapide, pour le repeinturage des carrosseries de vehicules automobiles