NR TI 101 ISSUE 2 PDF

NR TI 101 ISSUE 2 PDF

Name:
NR TI 101 ISSUE 2 PDF

Published Date:
12/01/2008

Status:
[ Active ]

Description:

Signalling Circuits Carried Over Telecoms Transmission Systems -Impact On Train Describer Specifications

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This instruction applies to all new Train Describer installations and modifications to existing Train Describers which utilise communication links between Adjacent Signal Boxes and Fringe Signal Boxes.

Purpose

The purpose of the TI is to mandate the use of Headers in accordance with NR/L3/SIG/00009 for all Train Describer communications between Adjacent Signal Boxes and Fringe Signal Boxes.


Edition : 2
File Size : 1 file , 35 KB
Number of Pages : 2
Published : 12/01/2008

History


Related products

NR NR/L2/SIG/14201/MOD04 ISSUE 3
Published Date: 12/05/2020
Signalling Risk Assessment Handbook: Prevention and Mitigation of Overruns - Signal Overrun Risk Assessment Tool Specification
$18.6
NR TWI 2B001 ISSUE 1
Published Date: 03/01/2005
How to Open out and Box in
$5.7
NR NR/CIV/SD/1123 ISSUE B
Published Date: 03/05/2011
Box Girder Underbridge Vehicle Collision Restraining Device Single Track - 2 Girders & Double Track - 2 or 3 Girders Details of Type 3 Device
$5.7
NR NR/L2/TRK/012/02 ISSUE 1
Published Date: 03/02/2019
Railway Crossings: Fatigue Life Evaluation and Structural Integrity
$18.6

Best-Selling Products

VDI/VDE/GESA 2635 Sheet 2
Published Date: 01/01/2004
Experimental structural analysis - Recommended practice for high-temperature strain measurements
VDI/VDE/GESA 2636
Published Date: 10/01/2000
Certification of courses and examinations in strain gage measurement technology