NR TWI 2T023 ISSUE 1 PDF

NR TWI 2T023 ISSUE 1 PDF

Name:
NR TWI 2T023 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Repair Misalignments by Hand

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This instruction covers:

• The repair of minor alignment defects in plain line by hand on track with linespeeds of 75mph or less. It does not cover:

• Sluing on tracks with linespeeds above 75mph

• The larger slues such as those found on relaying sites.

• Alignment problems in S&C.

• Track buckles.

• Sluing steel sleepered track - because this cannot be slued by hand.

See also separate instructions:

TWI 2T021 How to slue track manually

TWI 3G032 How to remove a buckle


Edition : 1
File Size : 1 file , 56 KB
Number of Pages : 4
Published : 03/01/2005

History


Related products

NR BRS-SM 505/3 ISSUE D
Published Date: 12/20/1978
Rail Clamp Point Lock Switch Diamond Layout Lock Arm Bracket Assembly at Switch Toe for Angles 1:5 to 1:7 Inc.
$5.7
NR BR 1928
Published Date: 12/01/1988
Solid State Interlocking Data Link Isolating Transformer
$5.7
NR NR/L2/P3M/220 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Integration
$18.6
NR NR/L2/SIG/30014/G110 ISSUE 1
Published Date: 09/03/2011
Signalling Non-Conceptual Works and Emergency Testing
$13.2

Best-Selling Products