NR TWI 3G127 ISSUE 1 PDF

NR TWI 3G127 ISSUE 1 PDF

Name:
NR TWI 3G127 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage the Use of Detonators

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to manage the use of detonators.

Detonators are carried by: lookouts, handsignallers and track inspectors. They are also used to protect worksites under the various forms of possession. They are not just for use in emergencies, but are handled, carried and stored in considerable numbers on a daily basis.

Detonators must be managed to ensure that they are available as required, but also to ensure that they are safe, secure and in date.

The use of the term detonator is common, and appears in the Rule Book, but the proper name is ‘Railway Fog Signal’ - under the various regulations that control explosives, etc.

Network Rail Company Specifications set out the regulations.


Edition : 1
File Size : 1 file , 46 KB
Number of Pages : 2
Published : 03/01/2005

History


Related products

NR NR/OTK/SD/BM/106 ISSUE B01
Published Date: 03/06/2021
Class II Chain Link & Steel Post Fence - Drawing
$5.7
NR NR/L3/OPS/045/4.18 ISSUE 3
Published Date: 06/05/2021
National Operating Procedure (NOP) 4.18: Management of Station Security and Crime
$7.5
NR RT/E/C/31201 ISSUE 1
Published Date: 12/01/2002
Telecommunications Maintenance Testing
$35.4
NR R00020 ISSUE 8
Published Date: 06/04/2022
Route Relay Interlocking, Typical Circuits - General Notes 1
$5.7

Best-Selling Products

15938 BNI51
Published Date: 01/01/1998
Americans With Disabilities Act Accessibility Guidelines Manual (ADAAG)
Aviation Accident Investigations
Published Date: 06/01/1999
$6