NR TWI 3T019 ISSUE 1 PDF

NR TWI 3T019 ISSUE 1 PDF

Name:
NR TWI 3T019 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Use a Continuous Action Tamper

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers the particular aspects of planning continuous action plain line tampers. These tampers can achieve very high rates of production. A singlebank tamper has an optimum production rate of around 500m per hour, whereas the triple-bank tamper can achieve 1500m per hour. This is because the tamper does not have to stop each time the tamping tines enter the ballast. The system operates by the machine moving steadily forward while the tamping frame and tamping banks (the satellite) works on the ballast. On completion of the compaction, the banks lift and the satellite moves forward along the machine to the next position to repeat the process. Satellite tamping bank

See also TWI 3T041 ‘How to Manage Tamping’, which covers the general matters to be considered when planning tamping.


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 2
Published : 03/01/2005

History


Related products

NR NR/L3/TRK/003 ISSUE 43
Published Date: 06/03/2023
Index of Track Engineering Forms
$18.6
NR BR 930 ISSUE 2
Published Date: 11/01/1985
Specification For Miniature Tractive Armature DC Neutral Line Relay (Plug-In Type) for Railway Signalling Purposes
$18.6
NR NR/L2/TRK/001/E01 ISSUE 4
Published Date: 12/05/2009
Inspection and Maintenance of Permanent Way - Installation Requirements, Maintenance Limits & Intervention Limits
$18.6
NR NB 213 ISSUE 1
Published Date: 11/04/2022
Pandrol Vortok AWS Fitment to RFF
$7.5

Best-Selling Products