QC-06-033 - BigHorn Home Improvement Center Energy Performance PDF

QC-06-033 - BigHorn Home Improvement Center Energy Performance PDF

Name:
QC-06-033 - BigHorn Home Improvement Center Energy Performance PDF

Published Date:
2006

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The BigHorn Development Project, located in Silverthorne,Colorado, is one of the nation’s first commercial buildingprojects to integrate extensive high-performance designinto a retail space. The BigHorn Home Improvement Center,completed in the spring of 2000, is a 42,366 ft2 (3,936 m2) hardwarestore, warehouse, and lumberyard. The authors werebrought in at the design stage of the project to provide researchlevelguidance to apply an integrated design process andperform a post-occupancy evaluation. An aggressive energydesign goal of 60% energy cost saving was set early in theprocess, which focused the efforts of the design team andprovided a goal for measuring the success of the project. Theextensive use of natural light, combined with energy-efficientelectrical lighting design, provides good illumination andexcellent energy savings. The reduced lighting loads, managementof solar gains, and cool climate allow natural ventilationto meet the cooling loads. A hydronic radiant floor system, gasfiredradiant heaters, and a transpired solar collector deliverheat. An 8.9 kW roof-integrated photovoltaic (PV) systemoffsets a portion of the electricity.

After construction, the authors installed monitoring equipmentto collect energy performance data and analyzed thebuilding’s energy performance for two-and-a-half years. Theauthors also helped program the building controls and providedrecommendations for improving operating efficiency. Thebuilding shows an estimated 53% energy cost saving and a 54%source energy saving. These savings were determined withwhole-building energy simulations that were calibrated withmeasured data. This paper discusses lessons learned related tothe design process, the daylighting performance, the PV system,and the heating, ventilating, and air-conditioning system.


File Size : 1 file , 1.8 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 18
Product Code(s) : D-28754
Published : 2006

History


Related products


Best-Selling Products

ASSP/AIHA Z10-2012 (R2017)
Published Date: 06/27/2012
Occupational Health & Safety Management Systems (Formerly ASSE/AIHA Z10-2012 (R2017))
ASSP/AIHA Z88.10-2001
Published Date: 06/08/2001
Respirator Fit Testing Methods
ASSP/AIHA Z88.10-2010
Published Date: 12/03/2010
Respirator Fit Testing Methods
ASSP/AIHA Z88.7-2010
Published Date: 06/14/2010
Color Coding of Air-purifying Respirator Canisters, Cartridges, and Filters
ASSP/AIHA Z9.1-2006
Published Date: 08/18/2006
Ventilation and Control of Airborne Contaminants During Open-Surface Tank Operations
$27.3
ASSP/AIHA Z9.10-2010
Published Date: 11/16/2010
Fundamentals Governing the Design and Operation of Dilution Ventilation Systems in Industrial Occupancies
$29.4