TO-22-C057 - The Impact of Existing Building Commissioning Measures on Peak Electric Demand PDF

TO-22-C057 - The Impact of Existing Building Commissioning Measures on Peak Electric Demand PDF

Name:
TO-22-C057 - The Impact of Existing Building Commissioning Measures on Peak Electric Demand PDF

Published Date:
2022

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
This paper investigates the independent impact of several different existing building commissioning (EBCx) measures on peak electric demand, to helpunderstand measures to prioritize based on peak demand savings along with the usually-assessed energy consumption savings. The investigation involvesdeveloping separate EnergyPlus™ models for each EBCx measure, and comparing the peak electric demand generated by each model with a baselinemodel. The pre-EBCx and post-EBCx models are based on a community college campus which underwent an EBCx project between 2014 and 2015,resulting in an average of 34% savings in energy consumption and peak demand. The total peak demand reduction determined from the individualEBCx measures was only 26% compared to the measured reduction of 34%. Applying an outside air temperature reset schedule to AHUs’ supply airtemperature (SAT) setpoints reduced peak demand by an average of 16.7%, mainly due to the reduction of unnecessary cooling and reheating, especiallyin winter. The optimization of AHU control schedules, which minimized the unnecessary operation of some units during peak hours produced peakdemand savings of 6%, while the optimization of space temperature setpoints contributed another 3%. While other measures impact electric demandduring non-peak hours, none produced peak electric demand reduction greater than 1%. Other measures did not generate peak demand savings while stillgenerating energy consumption savings, mainly for the reason of not having an impact during peak hours.
File Size : 1 file , 1.9 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-TO-22-C057
Published : 2022
Units of Measure : Dual

History


Related products


Best-Selling Products

PTI C30.1
Published Date: 01/01/2003
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 1 - FIELD FUNDAMENTALS
$21.9
PTI C30.1S
Published Date: 01/01/2006
ENTRENAMIENTO Y CERTIFICACIÓN DE PERSONAL DE CAMPO PARA POSTENSADO SIN TENDONES ADHERENTES
$21.9
PTI C30.2
Published Date: 01/01/2002
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - IRONWORKER
PTI C30.3
Published Date: 01/01/2006
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - POST-TENSIONING INSPECTOR
$29.4
PTI C30.4 ERTA
Published Date: 01/14/2022
Training and Certification of Field Personnel for Multistrand & Grouted Post‐Tensioning Student Manual
$0.3
PTI C30.4
Published Date: 02/01/2007
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR BONDED POST-TENSIONING