This slide presentation outlines an integrated decision support system for capital improvement planning. Project goals included:
study the Benefits of a
Structured Asset Management System to
prioritize capital improvement planning,
repair and rehabilitation, and
operations and maintenance. Project approach included:
Structured Decision-Making Process;
Use Harfan Technologies to Analyze Multiple
Funding Scenarios Based on Existing Data from
CMMS and GIS;
Enhance Data with Rapid Field Survey;
Run Analysis with Enhanced Data from InfraMetrix
Condition Assessment;
Develop an Integrated Model; and,
Consider the Affect of the Water System on the
Sewer System. Includes figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 1.1 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 21 |
| Published : | 03/01/2006 |