AWWA SOURCES59166 PDF

AWWA SOURCES59166 PDF

Name:
AWWA SOURCES59166 PDF

Published Date:
01/11/2004

Status:
Active

Description:

The Padre's Island and the Mother Lagoon: Desalination as a Water Supply Alternative for North Padre and Mustang Islands

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The City of Corpus Christi (City) currently provides water service to customers on North Padre Island, Port Aransas, and the Padre Island National Seashore through a single 24-inch subaqueous pipeline crossing the Laguna Madre near the JFK Causeway. Water demands in these service areas are expected to double, at minimum, over the next 20 years. The City has identified the need for an alternate supplemental water supply source to accomplish the objectives of improving existing water service, meeting projected demands, and improving overall system reliability, while maintaining cost-effectiveness. These objectives were to have been met by construction of a second subaqueous pipeline across the Laguna Madre. However, the environmental sensitivity of the Laguna Madre has led the City to consider whether other alternatives were available to meet its objectives. The goal of the Padre Island Desalination Plant (PIDP) Feasibility Analysis and Siting Plan is to answer that question. The PIDP Feasibility Analysis and Siting Plan is broad-based, and includes evaluation of: the character and sustainability of potential source waters, including two brackish groundwater aquifers and seawater from the Gulf of Mexico as reverse osmosis feed water; treatability of the three source water options by reverse osmosis (RO); RO byproduct disposal options, including ocean outfall, deep well injection, thermal distillation, evaporation ponds, and freeze concentration; six different facilities siting alternatives; alternative methods of groundwater extraction and well field siting options, with the objective of mitigating potential subsidence resulting from groundwater withdrawals; aquifer storage recovery (ASR) as a means to reduce capital expenditures; public issues and development of a public involvement plan; and, project delivery alternatives and potential funding sources. While economic evaluations were developed for a baseline 5.0 mgd project capacity, recommendations that included phased project implementation were developed. Based on the results of the study, the City of Corpus Christi is considering the role brackish water desalination may play in meeting its long-term water supply needs. As a next step, the City is considering implementation of a demonstration-level project that will include both brackish groundwater desalination and ASR. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1000 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 19
Published : 01/11/2004

History


Related products

AWWA SOURCES59150
Published Date: 01/11/2004
The Integrated Water Plan of the City of Santa Cruz, California
$7.2
AWWA SOURCES59171
Published Date: 01/11/2004
Texas 2003 Reuse Rules Revisions
$7.2
AWWA SOURCES59189
Published Date: 01/11/2004
Chasing the Flapper
$7.2
AWWA SOURCES59200
Published Date: 01/11/2004
Delivering Significant Savings with the Low-Income Housing Sector
$7.2

Best-Selling Products

Design for Earthquakes
Published Date: 01/01/1997
I C B O 9033C92
Published Date: 01/01/1992
CABO/ANSI A117.1 Commentary
ICBO 108H01
Published Date:
Principles of Fire Behavior
ICBO 108H02
Published Date:
Design of Water-Based Fire Protection Systems
ICBO 108H03
Published Date:
Hazardous Materials