NG UKBP/TP 191A PDF

NG UKBP/TP 191A PDF

Name:
NG UKBP/TP 191A PDF

Published Date:
05/01/2008

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Technical Assurance - Tasks and Responsibilities

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The purpose of this document is to define the responsibilities and tasks that comprise Core Construction Technical Assurance.

1. To both define/shape National Grid policy and process and audit/assist adherence to the same by the Alliances and Legacy Projects - with the objective of:

a) Targeting zero SHES incidents.

b) Targeting the very highest level of system reliability.

c) Enacting best and professional working practices

2. With reference to the Transmission Electricity Capital programme:

a) Agree the Capital programme for the next five years with Asset Management

b) Under the Project Manager (Core Construction Manager) for the NEC Contract Agreement – agree the content of the Capital programme to be delivered by each Alliance.

c) Manage the two-way change management process between Asset Management and the Alliances

 3. To support the delivery of Legacy projects in achieving 1a), b) and c) above.


Edition : 2
File Size : 1 file , 100 KB
Number of Pages : 18
Published : 05/01/2008

History

NG UKBP/TP 191
Published Date: 05/01/2013
UK Business Procedure/Transmission Procedures - Technical Assurance - Tasks and Responsibilities
$138
NG UKBP/TP 191A
Published Date: 05/01/2008
UK Business Procedure/Transmission Procedures - Technical Assurance - Tasks and Responsibilities
$138

Related products

NG TGN(E) 291
Published Date: 05/01/2016
Technical Guidance Note - Calculation of Indicative Fire Damage Zone
$59.1
NG CH 10
Published Date: 06/01/2015
Commissioning Handbook - Primary and Secondary Injection Requirement for an Additional Circuit of High Impedance Circulating Current Busbar Protection with Single (Duplicated) Relays per Zone
$55.2
NG TS 2.21
Published Date: 12/01/2010
Technical Specifications - 400KV and 275KV Mechanically Switched Capacitor Banks and Damping Networks
$55.2
NG UKBP/TP 162
Published Date: 12/01/2018
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
$138

Best-Selling Products

NS-CEN ISO/TS 15011-6:2012/AC:2012
Published Date: 07/15/2012
Health and safety in welding and allied processes - Laboratory method for sampling fume and gases - Part 6: Procedure for quantitative determination of fume and gases from resistance spot welding - Technical Corrigendum 1 (ISO/TS 15011-6:2012/Cor 1:2012)
Free Download