NG UKBP/TP 221 PDF

NG UKBP/TP 221 PDF

Name:
NG UKBP/TP 221 PDF

Published Date:
01/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Technical Data Processing and Assurance

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

The main purpose and scope of this procedure is to define the technical data process and subsequent validation to support Transmission Procedures which manage the creation, storage and modification of National Grid UK Electricity Technical Data acquired through the investment process. It is based on defining the process for capturing changes to Asset Data and providing assurance of Technical Data quality throughout the investment change, thus avoiding retrospective TOTEX to correct errors and reduce cost and associated risk that can be caused by inaccurate Technical Data

In addition, the procedure:

• Identifies the source and use of Technical Data covered by the procedure.

• Identifies the key users of Technical Data and Technical Data owners.

• Defines Technical Data validation stages to achieve assurance.

• Indentifies Technical Data storage and reporting requirements inline with Asset Data Quality Management Strategy for National Grid (UK) Transmission.

This procedure applies to all processes that creates or modifies Technical Data which comprises of the following data types:

• Operation Diagrams, Site Technical Data Schedules.

• Asset Data.

• Circuit names, Numbering & Nomenclature of HV Plant.

• Technical Data Workbooks.

• Site Responsibility Schedules (SRS).  

• Written Schemes of Examination (WSE).

• Fixed Asset Commissioning Certificate (FACC), Fixed Asset Disposal Certificate (FADC) & Fixed Asset Transfer Certificate (FATC) Data.

• SF6 Gas Inventory

This procedure is formatted on the basis that changes to asset data forms part of a Capital Investment delivered by Capital Delivery. For asset changes which form part of an ETAM Opearations delivered invstement then the responsble Project Engineer/Lead must adhere to the principles of this document.


Edition : 2
File Size : 1 file , 230 KB
Number of Pages : 17
Published : 01/01/2015

History

NG UKBP/TP 221
Published Date: 02/01/2019
UK Business Procedure/Transmission Procedures - Technical Data Processing and Assurance
$55.2
NG UKBP/TP 221
Published Date: 01/01/2015
UK Business Procedure/Transmission Procedures - Technical Data Processing and Assurance
$55.2
NG UKBP/TP 221
Published Date: 06/01/2012
UK Business Procedure/Transmission Procedures - Technical Data Assurance
$55.2

Related products

NG TS 2.24
Published Date: 03/01/2000
National Grid Technical Specifications - Substation Information, Control, Protection and Metering
$55.2
NG TS 2.30
Published Date: 02/01/2012
Technical Specifications - Series Compensation Bay for Connection To 275 Kv and 400 Kv Systems
$138
NG TS 3.01.01
Published Date: 12/01/2003
National Grid Technical Specifications - Substation Interlocking Schemes
$55.2
NG TS 3.11.01
Published Date: 04/01/2011
Technical Specifications - Shunt Capacitors and Capacitor Banks
$55.2

Best-Selling Products

IGEM UP/2
Published Date: 06/01/2014
Installation pipework on industrial and commercial premises