NR NB 185 ISSUE 5 PDF

NR NB 185 ISSUE 5 PDF

Name:
NR NB 185 ISSUE 5 PDF

Published Date:
07/20/2021

Status:
[ Revised ]

Description:

COVID – 19 Signal Engineering Contingency Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Previous editions for internal use only.

All Delivery Units where a full signalling maintenance regime cannot be supported due to a localised reduction of resource availability and the limitations imposed due to government restrictions.

Purpose

This Notice Board and the accompanying Appendices set out the Network Technical Head [Signalling] guidance on the management of inspection, maintenance and re-instatement of signalling assets where a localised reduction in availability of skilled resources due to COVID-19 means a full maintenance regime cannot be supported. This Notice Board is not to be used to change maintenance regimes for any other reason.

Included in this Notice Board are:

a) A list of critical tasks which are deemed essential to the safe running of the railway.

b) A prioritised list of maintenance tasks (Appendix A).

c) Generic risk assessment of tasks which can be used to support cancellation of maintenance services (Appendix A).

d) Alternative maintenance practices which can be used to maintain safety when not completing services in their entirety.

e) Guidance on limits related to prioritisation and cancellation of work in Ellipse.

f) Guidance on changes to assurance processes which support safety critical maintenance activities.


Edition : 5
File Size : 1 file , 270 KB
Number of Pages : 13
Published : 07/20/2021

History

NR NB 185 ISSUE 9
Published Date: 08/20/2024
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 8
Published Date: 05/03/2023
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 7
Published Date: 10/17/2022
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 6
Published Date: 06/17/2022
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 5
Published Date: 07/20/2021
COVID – 19 Signal Engineering Contingency Plan
$13.2

Related products

NR BRS-SM 154
Published Date: 08/18/1989
Colour Light Signals Plate - Adaptor Fibre Optic & Stencil Indicators for Posts & Spigots of 76 O/Diameter
$5.7
NR TWI 2C023 ISSUE 1
Published Date: 03/01/2005
How to Recognise Fishplate Types
$5.7
NR NR/L3/CIV/140/077C ISSUE 2
Published Date: 03/06/2010
Model Clause 077C: Diaphragm Walls
$5.7
NR RT/ETE/3/A/11
Published Date: 03/17/1998
Arrangement for Terminating 500mm sq or 800mm sq Aluminium Negative Feeder Cables & Associated Cross and Intertrack Bonds on Lines with Track Circuits
$5.7

Best-Selling Products

1A1W1S1 Archive Product 105
Published Date: 01/01/2000
Welding Inspection Handbook
1A1W1S1 Archive Product 111
Published Date: 02/01/1981
Welding Technology for the Aerospace Industry
1A1W1S1 Archive Product 115
Published Date: 01/01/2002
Structural Welding Code - Steel
1A1W1S1 Archive Product 138
Published Date: 01/01/2002
Standard Welding Procedure Specification (Swps) for Gas Tungsten Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1, P-1 or S-1 to M-8, P-8, or S-8), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing
1A1W1S1 Archive Product 142
Published Date: 01/01/2001
Ventilation Guide for Weld Fume
1A1W1S1 Archive Product 167
Published Date: 08/01/2008
Structural Welding Code Steel Bundled Set A