NR NB 185 ISSUE 7 PDF

NR NB 185 ISSUE 7 PDF

Name:
NR NB 185 ISSUE 7 PDF

Published Date:
10/17/2022

Status:
[ Revised ]

Description:

Signal Maintenance Contingency Planning

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

All Delivery Units where a full signalling maintenance regime cannot be supported where there is a localised reduction of resource availability. This Notice Board can only be used when specially authorised by the Regional Signalling Engineer, it’s use documented and the relevant standard variations are in place to support its use.

It cannot be used for any other purpose. 

Purpose

This Notice Board and the accompanying Appendices set out the Network Technical Head [Signalling] guidance on the management of inspection, maintenance and re-instatement of signalling assets where a localised reduction in availability of skilled resources means a full maintenance regime cannot be supported.

This Notice Board is not to be used to change maintenance regimes for any other reason.

Included in this Notice Board are:

a) A list of critical tasks which are deemed essential to the safe running of the railway.

b) A prioritised list of maintenance tasks (Appendix A).

c) Generic risk assessment of tasks which can be used to support cancellation of maintenance services (Appendix A).

d) Alternative maintenance practices which can be used to maintain safety when not completing services in their entirety.

e) Guidance on limits related to prioritisation and cancellation of work in Ellipse.

f) Guidance on changes to assurance processes which support safety critical maintenance activities.


Edition : 7
File Size : 1 file , 280 KB
Number of Pages : 13
Published : 10/17/2022

History

NR NB 185 ISSUE 9
Published Date: 08/20/2024
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 8
Published Date: 05/03/2023
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 7
Published Date: 10/17/2022
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 6
Published Date: 06/17/2022
Signal Maintenance Contingency Planning
$13.2
NR NB 185 ISSUE 5
Published Date: 07/20/2021
COVID – 19 Signal Engineering Contingency Plan
$13.2

Related products

NR NB 224 ISSUE 2
Published Date: 03/07/2024
Asbestos-Containing Materials (ACMs) in Signal Relays
$5.7
NR SSI8003-105 ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - Level Crossings - Guidelines for Two Signals in the Same Sector (aka RT/SSI/8003-105)
$18.6
NR NR/L3/OHS/005/01 ISSUE 2
Published Date: 06/04/2022
Design and Construction in a High Street Environment: High Street Project Standards Catalogue - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/SIN/167 ISSUE 1
Published Date: 07/03/2017
Track Geometry and Rail Ultrasonic Testing Inspection Plans – Compliance Check
$13.2

Best-Selling Products

VITA 1.1
Published Date: 01/01/1997
VME64 Extensions
VITA 1.3
Published Date: 01/01/1997
VME64x 9U x 400 mm Format
VITA 1.5
Published Date: 01/01/2003
2eSST Source Synchronous Transfer
VITA 1.6
Published Date: 01/01/2000
Keying for Conduction Cooled VME64x
VITA 1.7
Published Date: 01/01/2003
Increased Current DIN Connector
VITA 12
Published Date: 01/01/1997
M-Module