NR NR/L2/OHS/005 ISSUE 7 PDF

NR NR/L2/OHS/005 ISSUE 7 PDF

Name:
NR NR/L2/OHS/005 ISSUE 7 PDF

Published Date:
09/04/2010

Status:
[ Inactive ]

Description:

"High Street" Environment and Conditions for Work Outside Network Rail Managed Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This standard applies to work which can be segregated from railway operations in such a way that safety risks cannot be transferred from the site of work to the operational railway and vice versa.

This standard covers personal safety, the arrangements for the working of mechanical equipment, general construction plant, the movement and storage of materials and any other activities involved with the work.

This standard may be applied to outside party work when circumstances permit.

This standard does not apply where the work activity could cause or transfer risk to the operational railway (see clause 4 for specific restrictions).

Purpose

The purpose of this standard is to specify the requirements for the segregation of work activities on, or adjacent to, Network Rail Managed Infrastructure (NRMI) from railway operations. This allows work to take place without the necessity to apply the specific control measures associated with the operational railway (i.e. in a "High Street" environment), but in doing so requires other controls and a controlled environment.


Edition : 7
File Size : 1 file , 410 KB
Number of Pages : 15
Published : 09/04/2010

History


Related products

NR X70210 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits 2 Barrier Detection Circuits
$5.7
NR NR/SIG/10665/MOD 020 ISSUE 1
Published Date: 03/02/2013
Reliability Centred Maintenance of Signalling Equipment (ROSE) - AC 50 Hz Track Circuit - Service B (NR/ROSE/TC-B1/1)
$5.7
NR NR/CIV/SD/2802 ISSUE B
Published Date: 09/02/2017
Modular Overbridge Design: Trief Kerb, Guardrail & Drainage Details
$5.7
NR BR 928
Published Date: 10/01/1977
Specification for Charger for 24 Volt Battery 110 Volt or 240 Volt 50 Hz Supply
$7.5

Best-Selling Products

PTI C30.1
Published Date: 01/01/2003
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 1 - FIELD FUNDAMENTALS
$21.9
PTI C30.1S
Published Date: 01/01/2006
ENTRENAMIENTO Y CERTIFICACIÓN DE PERSONAL DE CAMPO PARA POSTENSADO SIN TENDONES ADHERENTES
$21.9
PTI C30.2
Published Date: 01/01/2002
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - IRONWORKER
PTI C30.3
Published Date: 01/01/2006
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - POST-TENSIONING INSPECTOR
$29.4
PTI C30.4 ERTA
Published Date: 01/14/2022
Training and Certification of Field Personnel for Multistrand & Grouted Post‐Tensioning Student Manual
$0.3
PTI C30.4
Published Date: 02/01/2007
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR BONDED POST-TENSIONING