NR NR/L2/OHS/501/W1 ISSUE 1 PDF

NR NR/L2/OHS/501/W1 ISSUE 1 PDF

Name:
NR NR/L2/OHS/501/W1 ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Revised ]

Description:

Trackworker Protection and Warning Systems: Module W1: Semi-Automatic Track Warning System (SATWS)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to all SATWS systems used on Network Rail Managed Infrastructure.

NOTE: SATWS is not interfaced with the signalling system. The equipment is owned and managed by the local manager of the function using it e.g. Infrastructure Maintenance Delivery Manager, HOBC project manager etc..

Purpose

This module mandates the requirements for the use of Semi-Automatic Track Warning Systems (SATWS) on Network Rail Managed Infrastructure

In addition, it provides details of:

• Technical requirements

• Competence requirements

• Planning, installation, use, and removal.


Edition : 1
File Size : 1 file , 360 KB
Number of Pages : 24
Published : 12/05/2020

History

NR NR/L2/OHS/501/W1 ISSUE 3
Published Date: 03/05/2022
Trackworker Protection and Warning Systems: Module W1: Semi-Automatic Track Warning System (SATWS)
$18.6
NR NR/L2/OHS/501/W1 ISSUE 2
Published Date: 12/04/2021
Trackworker Protection and Warning Systems: Module W1: Semi-Automatic Track Warning System (SATWS)
$18.6
NR NR/L2/OHS/501/W1 ISSUE 1
Published Date: 12/05/2020
Trackworker Protection and Warning Systems: Module W1: Semi-Automatic Track Warning System (SATWS)
$18.6

Related products

NR RT/E/WI/27084 ISSUE 1
Published Date: 12/04/2004
Examination & Testing of a Primary Insulator Pole which May Contact Live Overhead Line Equipment (aka NR/WI/ELP/27084)
$18.6
NR NR/CIV/SD/561 ISSUE B
Published Date: 09/02/2017
Tunnels Shaft Liner Plates: Height of Repair Less than 5M: General Arrangement
$5.7
NR RT/D/G/091 ISSUE 1
Published Date: 10/05/2002
Project and Commercial Management of the Implementation of MMS
$18.6
NR BRS-SM 597/1
Published Date: 03/18/1985
Hydraulically Operated Unlocked Yard Points Thrust Bracket & Baseplate
$5.7

Best-Selling Products

UIC 895
Published Date: 01/07/1976
Technical Specification for the Supply of Insulated Electric Cables for Railway Vehicles