Name:
NR NR/L2/SIG/11201/MODA04 ISSUE 5 PDF
Published Date:
09/03/2011
Status:
[ Withdrawn ]
Publisher:
Network Rail
Outline and Scope
A brief description of the agreed scheme should be provided, as defined by the client remit, OPS and the scheme plan and the extent of works.
Where existing signalling is being altered, the existing arrangements should be described with a statement of what it is proposed to retain. New, retained and abolished signal boxes or other control points should be stated.
| Edition : | 5 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 14 |
| Published : | 09/03/2011 |