NR NR/L2/SIG/30009/A100 ISSUE 5 PDF

NR NR/L2/SIG/30009/A100 ISSUE 5 PDF

Name:
NR NR/L2/SIG/30009/A100 ISSUE 5 PDF

Published Date:
12/02/2023

Status:
[ Not for New Design ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

The terms defined in this module apply to the implementation of signalling logic to implement required functional requirements, whether that is to be achieved in the interlocking itself, or at the trackside, or within the signaller’s control system or other related system.

The selection of relevant terms primarily reflects those with relevance to Multiple Aspect Signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system.

Purpose 

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. Its purpose is to provide a single document within which all definitions are stated, so that the various other modules of the handbook adopt consistent use of the terms. 


Edition : 5
File Size : 2 files , 1.3 MB
Number of Pages : 57
Published : 12/02/2023

History

NR NR/L2/SIG/30009/A100 ISSUE 6
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions
$24.3
NR NR/L2/SIG/30009/A100 ISSUE 5
Published Date: 12/02/2023
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$24.3
NR NR/L2/SIG/30009/A100 ISSUE 4
Published Date: 12/03/2022
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions
$24.3
NR NR/L2/SIG/30009/A100 ISSUE 3
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions
$24.3
NR NR/L2/SIG/30009/A100 ISSUE 2
Published Date: 09/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Definitions
$24.3
NR NR/L2/SIG/30009/A100 ISSUE 1
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Definitions
$18.6

Related products

NR BRS-SM 6/1 ISSUE B
Published Date: 05/01/1991
Back Blinder Arm
$5.7
NR NR/L3/OPS/045/5.05 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 5.05: Management of Access and Restricted Areas
$7.5
NR NR/L2/SIG/11752/PART H ISSUE 2
Published Date: 08/01/2001
Train Detection Handbook Part H: Design Requirements
$18.6
NR NR/L3/INI/PG115/PS/013 ISSUE 1
Published Date: 06/05/2010
Planning and Programme Controls: Guidance on Project Schedule Model Baseline Management
$7.5

Best-Selling Products