NR NR/L3/OPS/045/3.06 ISSUE 1 PDF

NR NR/L3/OPS/045/3.06 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.06 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Revised ]

Description:

National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

Dynamic Risk Assessment (DRA) is a process which facilitates the effective management of safety risk during unplanned, unexpected and evolving situations. It is not an alternative to planned and proactive risk assessment for normal work situations, nor is it a mechanism for bypassing rules or standards during planned, recurring, routine or scheduled work.

The DRA process is to be used in conjunction with the modular Rule Book, Group and company standards and the National Operating Instructions.

Its application should be limited to Network Operations Management staff seeking to assess operational risk, and identify control measures in connection with incidents affecting the normal operation of the railway. Specifically it should be used when there is no rule to cover the situation but actions must be taken to resolve the situation.

PURPOSE

This procedure provides a continuous assessment of risk in the rapidly changing circumstances of an operational incident to implement control measures to make certain of an acceptable level of safety.


Edition : 1
File Size : 1 file , 300 KB
Number of Pages : 6
Published : 09/02/2017

History

NR NR/L3/OPS/045/3.06 ISSUE 3
Published Date: 12/02/2023
National Operating Procedure (NOP) 3.06: Operational Decision Making
$7.5
NR NR/L3/OPS/045/3.06 ISSUE 2
Published Date: 11/07/2020
National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process
$7.5
NR NR/L3/OPS/045/3.06 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process
$7.5

Related products

NR TWI 3S093 ISSUE 1
Published Date: 03/01/2005
How to Tamp Switches and Crossings
$5.7
NR RT/E/WI/27082 ISSUE 1
Published Date: 12/04/2004
Instruction for Electrical Testing of Glass Fibre Height & Stagger Gauge (aka NR/WI/ELP/27082)
$18.6
NR NR/CIV/SD/811 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: Web Strengthening Cross Girder Interface Type 4
$5.7
NR BRS-SM 52478 ISSUE A
Published Date: 08/06/1996
Parts Schedule for Crank Base Assembly for 113A Layouts
$5.7

Best-Selling Products

Laser Pointer Keychain
Published Date: 10/23/2002
$4.5
Leatherman Micra Multi-purpose Tool
Published Date: 10/23/2002
$10.5
Single Sign-On
Published Date:
Techstreet Binder
Published Date:
4" Stay-Flat Techstreet Binder
Techstreet DRM Test Sep 2020
Published Date:
DRM Test Sep 2020 this one
$3.6