NR NR/L3/OPS/045/3.06 ISSUE 2 PDF

NR NR/L3/OPS/045/3.06 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/3.06 ISSUE 2 PDF

Published Date:
11/07/2020

Status:
[ Revised ]

Description:

National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

a) The DRA process is to be used in conjunction with GE/RT8000, Group and company standards and NR/OPS/NOI.

b) Its application is to assess operational risk and identify control measures in connection with incidents affecting the normal operation of the railway however the process is not limited to use by Operations staff. Specifically, it should be used when there is no rule to cover the situation, but actions are to be taken to resolve the situation.

Purpose

This procedure is designed to manage risk in the rapidly changing circumstances of an operational incident to implement control measures to make a condition safe or approve a temporary method of work due to an incident.

It is not an alternative to planned and proactive risk assessment for normal work situations, nor is it a mechanism for bypassing rules or standards during planned, recurring, routine or scheduled work.


Edition : 2
File Size : 1 file , 290 KB
Number of Pages : 7
Published : 11/07/2020

History

NR NR/L3/OPS/045/3.06 ISSUE 3
Published Date: 12/02/2023
National Operating Procedure (NOP) 3.06: Operational Decision Making
$7.5
NR NR/L3/OPS/045/3.06 ISSUE 2
Published Date: 11/07/2020
National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process
$7.5
NR NR/L3/OPS/045/3.06 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process
$7.5

Related products

NR RT/E/WI/00009 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Detonator Placers
$13.2
NR X20110 ISSUE 2
Published Date: 08/07/2004
ABCL TYPICAL CIRCUITS MOTOR & VALVE CIRCUITS
$5.7
NR NR/CIV/SD/2017 ISSUE B
Published Date: 06/04/2016
Conarch Overbridge: General Arrangement 7.4m Internal Unit Right Skew 45º
$5.7
NR NR/L3/INI/P3M/132/01 ISSUE 1
Published Date: 03/03/2018
Portfolio Integration Manual: Consolidated Planning of Key Resources
$13.2

Best-Selling Products