NR NR/L3/OPS/045/3.06 ISSUE 3 PDF

NR NR/L3/OPS/045/3.06 ISSUE 3 PDF

Name:
NR NR/L3/OPS/045/3.06 ISSUE 3 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.06: Operational Decision Making

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

a) The decision making tool process is to be used in conjunction with GE/RT8000, Group and company standards and NR/OPS/NOI.

b) Its application is to assess operational risk and identify control measures in connection with incidents affecting the normal operation of the railway. However, the process is not limited to use by Operations staff. Specifically, it should be used when alternative actions are to be taken to resolve the situation.

c) The decision making tool is a requirement of Health & Safety at Work Act Sections 2 & 3 in that opting ‘to do nothing’ can place staff and public at risk, regardless of what is stated in the Rule Book or other operating standard.

d) The scope of the process does not cover the response to environmental emergencies but may be used to manage the operational aspects of these incidents.

e) The scope of the process does not cover access onto the infrastructure as defined within NR/L2/OHS/019.

PURPOSE 

This procedure is designed for all possible options to be considered during an emergency to allow the safe movement of trains or manage a scenario that has resulted in or might result in harm or an adverse impact on passengers or staff. This includes the approval of a temporary method of work following an emergency incident or due to network condition. It will also provide a mechanism to facilitate access during line closures when operating locations are closed. 

The procedure is not an alternative to planned and proactive risk assessment for normal work situations, nor is it a mechanism to bypass the normal deviation process from rules or standards for planned, recurring, routine or scheduled work. The procedure will allow for improved review of customer requirements where: 

a) there is no rule, standard or process to cover the situation; 

b) when there are conflicting rules, standards or processes that could introduce confusion or risk in the situation; 

c) applying the rule, standard or process in the situation will introduce risk and a safer alternative exists; and 

d) where the application of the rule, standard or process is grossly disproportionate in the situation.


Edition : 3
File Size : 1 file , 360 KB
Number of Pages : 7
Published : 12/02/2023

History

NR NR/L3/OPS/045/3.06 ISSUE 3
Published Date: 12/02/2023
National Operating Procedure (NOP) 3.06: Operational Decision Making
$7.5
NR NR/L3/OPS/045/3.06 ISSUE 2
Published Date: 11/07/2020
National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process
$7.5
NR NR/L3/OPS/045/3.06 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.06: Dynamic Risk Assessment Process
$7.5

Related products

NR E10016/05 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Point Machines Point Control Circuits (Route Relay Int. Panels) Clamp Lock Machines
$5.7
NR NR/L3/TRK/1014 ISSUE 3
Published Date: 08/26/2008
Management of Broken Rails
$7.5
NR NR/L3/INI/CP0026 ISSUE 2
Published Date: 06/01/2008
Process for Locating Buried Services Prior to Ground Penetration
$7.5
NR NR/GN/SIG/11900 ISSUE 1
Published Date: 04/01/2006
Application Manual for Axle Counter
$18.6

Best-Selling Products