NR NR/L3/SCO/311/02 ISSUE 1 PDF

NR NR/L3/SCO/311/02 ISSUE 1 PDF

Name:
NR NR/L3/SCO/311/02 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This manual provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module provides requirements that establish an ISO55001 AMS within SCO for T&RS and OTM assets.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 1
File Size : 1 file , 210 KB
Number of Pages : 7
Published : 06/02/2018

History

NR NR/L3/SCO/311/02 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR NR/L3/SCO/311/02 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR NR/L3/SCO/311/02 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5

Related products

NR SF/CTM/301F ISSUE 1
Published Date: 06/05/2010
Non-Conformance Register
$5.7
NR NR/L2/SIG/19820/J01 ISSUE 1
Published Date: 03/02/2019
Signalling Product Specifications: Digital Video Recorders for Use at Level Crossings
$7.5
NR NR/L3/ELP/SAI25/MOD Z ISSUE 2
Published Date: 12/02/2023
Working on or About 25 kV A.C. Electrified Lines: Isolation and Earthing of Sunderland 1500V d.c. Overhead Electrified Lines
$13.2
NR NR/CIV/SD/1023 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Wide Floor 0-20 Degrees Skew Sheet 2 of 2
$5.7

Best-Selling Products

ASQ A3534-1-1993
Published Date: 01/01/1993
ANSI/ISO/ASQ Standard - Statistics - Vocabulary and Symbols - Probability and General Statistical Terms (Revision and Redesignation of ANSI/ASQ A1 and A2-1987)
$19.5
ASQ B1-B3-1996
Published Date: 02/26/1996
Guide for Quality Control Charts - Control Chart Method of Analyzing Data - Control Chart Method of Controlling Quality During Production - Includes B1, B2, and B3
$17.7
ASQ C1-1996
Published Date: 01/01/1996
Specifications of General Requirements for a Quality Program - SAME AS ANSI Z1.8-1971
$14.7
ASQ D1160-1995
Published Date: 01/01/1995
Formal Design Review
$14.7