NR NR/L3/SCO/311/02 ISSUE 2 PDF

NR NR/L3/SCO/311/02 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/02 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module.

Purpose

This manual provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module provides requirements that establish an ISO55001 AMS within SCO for T&RS and OTM assets.

The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 250 KB
Number of Pages : 7
Published : 03/02/2019

History

NR NR/L3/SCO/311/02 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR NR/L3/SCO/311/02 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5
NR NR/L3/SCO/311/02 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Risk, Competence and Asset Management System
$7.5

Related products

NR NR/L2/SIG/11201/MOD A3-10 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Signalling Scheme Plans Best Practice
$7.5
NR RT/K/P/003 ISSUE 1
Published Date: 06/01/1996
Supplier Performance Feedback
$18.6
NR SAO-SSP(002)-UG-3 ISSUE 1.1
Published Date: 03/01/2001
IECC Upgrade 002 TTP Factory Tester Briefing Note
$7.5
NR NR/L3/ELP/27240/NR/DIST C22N ISSUE 2
Published Date: 03/01/2017
Instruction for the Routine Maintenance of a Calor EMAG 33kV SF6 - Insulated Vacuum Interrupter Circuit Breaker Type ZV2
$5.7

Best-Selling Products

VDI/DGQ 3441
Published Date: 03/01/1977
Statistical Testing of the Operational and Positional Accuracy of Machine Tools; Basis
VDI/DGQ 3442
Published Date: 03/01/1977
Statical examination of exactly working of turing machines
VDI/DGQ 3443
Published Date: 03/01/1977
Statistical examination of exactly working of milling machines
VDI/DGQ 3444
Published Date: 09/01/1978
Statistical control of exactly working and positioning of coordinate drilling machines and machining centers
VDI/DGQ 3445 Sheet 1
Published Date: 03/01/1977
Statistical examination of exactly working of grinding machines; fundamentels
VDI/DGQ 3445 Sheet 2
Published Date: 03/01/1977
Statistical examination of exactly working of grinding machines; external cylindrical grinding machines with center points; plunge-cut grinding operation