NR NR/L3/SCO/311/09 ISSUE 1 PDF

NR NR/L3/SCO/311/09 ISSUE 1 PDF

Name:
NR NR/L3/SCO/311/09 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-sco-311-09-issue-1_2810869

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This manual is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specifie

d) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details the procedure for the management of deferral for SCO managed fleet.

The deferral procedure provides instruction to allow the;

a. Assessment and control of risks related to defects and deferral from the maintenance plan.

b. Recording and monitoring of deferrals.

c. Approval of deferrals.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On-Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 1
File Size : 1 file , 240 KB
Number of Pages : 11
Published : 06/02/2018

History

NR NR/L3/SCO/311/09 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
7.50 €
NR NR/L3/SCO/311/09 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
13.20 €
NR NR/L3/SCO/311/09 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
13.20 €

Related products

NR RT/D/P/024 ISSUE 2
Published Date: 01/01/1998
REVIEW OF NON-COMPLIANCE TO STANDARDS - RTIA
7.50 €
NR BRS-SE 61/2 ISSUE C
Published Date: 04/20/1994
Electric Point Detector Left Hand Cam Follower Assembly Type B
5.70 €
NR NR/L2/SIG/30009/E063 ISSUE 6
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Approach Locking, Route Cancellation and Route Releasing
18.60 €
NR NR/L2/OHS/00120 ISSUE 7
Published Date: 03/04/2023
Drugs, Alcohol and Substance Misuse in the Workplace
18.60 €

Best-Selling Products

Finding & Managing Subcontractors
Published Date: 03/01/1996
12.00 €