Name:
NR NR/L3/SCO/311/09 ISSUE 1 PDF
Published Date:
06/02/2018
Status:
[ Revised ]
Publisher:
Network Rail
This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).
This manual is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.
SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.
On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.
Purpose
This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specifie
d) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.
This module details the procedure for the management of deferral for SCO managed fleet.
The deferral procedure provides instruction to allow the;
a. Assessment and control of risks related to defects and deferral from the maintenance plan.
b. Recording and monitoring of deferrals.
c. Approval of deferrals.
The application of the requirements and procedures contained within this manual mitigate the following high level risks:
a) Non-compliance with legislation and regulatory requirements.
b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On-Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.
c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.
| Edition : | 1 |
| File Size : | 1 file , 240 KB |
| Number of Pages : | 11 |
| Published : | 06/02/2018 |