NR NR/L3/SCO/311/09 ISSUE 2 PDF

NR NR/L3/SCO/311/09 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/09 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This manual is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details the procedure for the management of deferral for SCO managed fleet.

The deferral procedure provides instruction to allow the;

a. Assessment and control of risks related to defects and deferral from the maintenance plan.

b. Recording and monitoring of deferrals.

c. Approval of deferrals.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 300 KB
Number of Pages : 11
Published : 03/02/2019

History

NR NR/L3/SCO/311/09 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
$7.5
NR NR/L3/SCO/311/09 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
$13.2
NR NR/L3/SCO/311/09 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
$13.2

Related products

NR RT/E/C/19019 ISSUE 2
Published Date: 04/01/1999
Signalling Equipment Technical Advice Notice (SIGTAN019) Westinghouse Signal Machines (aka NR/GN/SIG/19019)
$7.5
NR RT/E/P/02016 ISSUE 0
Published Date: 10/01/1996
Contract Technical Workscopes Routing of Comments & Feedback
$7.5
NR BRS-SW 67-57 ISSUE 6
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Technician's Monitor Panel
$5.7
NR RT/E/WI/00112 ISSUE 1
Published Date: 09/01/2004
Isolation & Earthing Instructions for Cauldwell Depot TSC (aka NR/WI/ELP/00112)
$13.2

Best-Selling Products

CEMA 102-1994
Published Date: 01/01/1994
Conveyor Terms & Definitions
CEMA 110-1995
Published Date: 01/01/1995
Electrical Terms & Definitions
CEMA 201-1995
Published Date: 01/01/1995
Safety Label Brochure
CEMA 300-1999
Published Date: 01/01/1999
Screw Conveyors, Dimensional Standards
CEMA 300-2003
Published Date:
Screw Conveyors, Dimensional Standards