NR NR/L3/SCO/311/09 ISSUE 3 PDF

NR NR/L3/SCO/311/09 ISSUE 3 PDF

Name:
NR NR/L3/SCO/311/09 ISSUE 3 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module. 

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details the procedure for the management of deferral for SCO managed fleet. 

The deferral procedure provides instruction to allow the; 

a) Assessment and control of risks related to defects and deferral from the maintenance plan. 

b) Recording and monitoring of deferrals. 

c) Approval of deferrals

The application of the requirements and procedures contained within this module mitigate the following high-level risks:

d) Non-compliance with legislation and regulatory requirements.

e) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

f) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure. 


Edition : 3
File Size : 1 file , 210 KB
Number of Pages : 10
Published : 03/05/2022

History

NR NR/L3/SCO/311/09 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
$7.5
NR NR/L3/SCO/311/09 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
$13.2
NR NR/L3/SCO/311/09 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Deferral of Maintenance or Repair
$13.2

Related products

NR RT/E/WI/00009 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Detonator Placers
$13.2
NR NR/L3/CIV/006/3C ISSUE 1
Published Date: 09/07/2019
Structures, Tunnels and Operational Property Examinations: Examination of Operational Property Structures and Fabric - Visual Examinations
$13.2
NR NR/L3/CIV/140/073C ISSUE 2
Published Date: 03/06/2010
Model Clause 073C: Steel Piles
$5.7
NR BRS-SM 52570
Published Date: 01/30/1995
Parts Schedule for Mechanical Backdrive Mounted in 4' Full Depth CV Layout Clamp Lock Operated
$5.7

Best-Selling Products

Programmable Controllers
Published Date: 01/01/2001
$22.8