NR NR/SIN/133 ISSUE 1 PDF

NR NR/SIN/133 ISSUE 1 PDF

Name:
NR NR/SIN/133 ISSUE 1 PDF

Published Date:
07/16/2014

Status:
[ Withdrawn ]

Description:

Assessment of Level Crossing Closure Times

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-sin-133-issue-1_2780488

Choose Document Language:
24.30 €
Need Help?
W/D * PDF ONLY

The SIN applies to all automatic level crossings.

The types of crossing in scope include the following. The list may not be exhaustive:

  • Automatic Half Barrier (AHB); equipped with road traffic lights and audible warning
  • Automatic Half Barrier with local or remote monitoring (ABCL, AOCL, AOCL+B, AOCR); equipped with road traffic lights and audible warning
  • Footpath Crossings, Station Crossings, User Worked Crossings; equipped with miniature Red/Green lights (MSL, MWL, Overlay MSL) with either Red and Green or Red and White Lights
  • Station crossings (commonly termed "Barrow Crossings"); equipped with white lights that extinguish as a train approaches.

Full barrier crossings are not included in the scope of this project, as they are not the subject of the RAIB Report recommend.

The Warning Time starts when a train strikes-in, when the level crossing gives the users the "stop" message or the yellow aspect on Road Lights. It finishes when the train arrives at the level crossing area.

Purpose

The purpose of this Special Inspection Notice (SIN) mandates the process to define the scope for recording and assessing the warning time given to the users of automatic level crossings.

This SIN represents the first stage in accomplishing the objective to eliminate excessive warning times at level crossings. The data produced by the process mandated by this SIN will be used to scope the action plan to measure and assess the recorded warning times of trains.


Edition : 1
File Size : 1 file , 1.6 MB
Number of Pages : 57
Published : 07/16/2014

History


Related products

NR RT/E/S/17503 ISSUE 1
Published Date: 06/01/1999
IECC Internal Subsystems Communications requirements (aka NR/SP/SIG/17503)
18.60 €
NR NR/L3/OCS/044/MS-02 ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: Photo Identification Cards and Access Control Systems
13.20 €
NR RT/D/P/054 ISSUE 1
Published Date: 08/01/1996
SAFETY PERFORMANCE MONITORING OF CONTRACTS FOR PROJECT WORK
7.50 €
NR RT/CE/S/085 ISSUE 1
Published Date: 04/01/2004
Examination of Tunnels (aka NR/SP/CIV/085 or NR/L2/CIV/085)
24.30 €

Best-Selling Products

RIA-A3 R15.05-1-1990 (R1999)
Published Date: 01/01/1999
Evaluation of Point-to-Point and Static Performance Characteristics of Industrial Robots and Robot Systems
RIA-A3 R15.05-2-1992 (R1999)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Path-Related and Dynamic Performance Characteristics - Evaluation
RIA-A3 R15.05-3-1992 (R1999)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Reliability Acceptance Testing - Guidelines
RIA-A3 R15.06-1999 (R2009)
Published Date: 01/01/1999
Industrial Robots and Robot Systems - Safety Requirements
RIA-A3 R15.06-2012
Published Date: 03/28/2013
Industrial Robots and Robot Systems - Safety Requirements
97.50 €
RIA-A3 R15.08-1-2020
Published Date: 12/25/2020
Industrial Robots and Robot Systems - Safety Requirements Part 1: Requirements for the Industrial Mobile Robot
67.50 €