Name:
NR NR/SIN/133 ISSUE 1 PDF
Published Date:
07/16/2014
Status:
[ Withdrawn ]
Publisher:
Network Rail
The SIN applies to all automatic level crossings.
The types of crossing in scope include the following. The list may not be exhaustive:
Full barrier crossings are not included in the scope of this project, as they are not the subject of the RAIB Report recommend.
The Warning Time starts when a train strikes-in, when the level crossing gives the users the "stop" message or the yellow aspect on Road Lights. It finishes when the train arrives at the level crossing area.
Purpose
The purpose of this Special Inspection Notice (SIN) mandates the process to define the scope for recording and assessing the warning time given to the users of automatic level crossings.
This SIN represents the first stage in accomplishing the objective to eliminate excessive warning times at level crossings. The data produced by the process mandated by this SIN will be used to scope the action plan to measure and assess the recorded warning times of trains.
| Edition : | 1 |
| File Size : | 1 file , 1.6 MB |
| Number of Pages : | 57 |
| Published : | 07/16/2014 |