NR RT/E/WI/00101 ISSUE 1 PDF

NR RT/E/WI/00101 ISSUE 1 PDF

Name:
NR RT/E/WI/00101 ISSUE 1 PDF

Published Date:
12/01/2002

Status:
[ Withdrawn ]

Description:

Risk Based Maintenance Rail Clamp Point Lock (aka NR/WI/SIG/00101)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

This maintenance specification applies to all rail clamp point lock configurations defined within Railtrack Line Code of Practice RT/E/C/11774 ‘Rail Clamp Point Locks', Issue 1, December 2000.

This maintenance specification DOES NOT include tasks associated with the following:

• Testing activities for earth leakage detection.

• Maintenance of any point heater equipment.

• Maintenance of power supply equipment

This maintenance specification shall be applied where implementation of Risk-Based Maintenance has been authorised in accordance with Railtrack Line Specification RT/E/S/10662 ‘Process for the Introduction of New or Revised Maintenance Regimes for Signalling Assets'.

The frequency of application of the tasks defined in this specification is defined in the RT/E/S/10661, ‘Signalling Maintenance Task Intervals'.

This maintenance specification contains a number of minor tasks normally associated with track maintenance activities. The inclusion of these tasks in no way reduces the separate requirement for track maintenance in accordance with:

• RT/CE/S/053 ‘Inspection and Repair Procedures to Reduce the Risk of Derailment at Switches'.

• RT/CE/S/103 ‘Track Inspection Requirements'.

• RT/CE/S/104 ‘Track Maintenance Requirements'.

PURPOSE

To detail the maintenance tasks required for the Rail Clamp Point Lock risk-based maintenance regime.


Edition : 1
File Size : 1 file , 6.9 MB
Number of Pages : 41
Published : 12/01/2002

History


Related products

NR NR/L3/ELP/29987/MOD10 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/27240 ISSUE 12
Published Date: 06/03/2023
Distribution Work Instructions
$13.2
NR NR/L2/TRK/038 ISSUE 8
Published Date: 09/04/2021
Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits
$13.2
NR NR/L2/SIG/30014/D115/DT1-03 ISSUE 2
Published Date: 12/05/2020
Signalling Works Testing Handbook: Defined Inspection Check - Check for Correct Position
$5.7

Best-Selling Products

Impact & Blast Loading of Concrete
Published Date: 06/01/1990