NR TI 138 ISSUE 1 PDF

NR TI 138 ISSUE 1 PDF

Name:
NR TI 138 ISSUE 1 PDF

Published Date:
04/01/2009

Status:
[ Withdrawn ]

Description:

Campaign Change - Fitment of LED DCIs

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This instruction applies to the campaign change programme for DCIs that is being managed by Infrastructure Investment Group and shall not be used for any other changes. Where the installation presently have white only DCI then the campaign change will replace the DCI and the DRL can be brought into operation. Should there be issues that prevent the DRL from being brought into operation then the DCI should be replaced and the red aspect removed from the new DCI and its aperture blanked off using the approved blanking plate.

Purpose

This Technical Instruction supports TI 137 where LED DCI units are to be fitted in place of the existing incandescent lamp units. This TI allows the change of the DCI to LED by using the campaign change Test Plan contained within this TI. This work will replace the DCI head for an LED type and any changes to the circuitry that are required. Generally these changes are in the illumination of the LED and NOT in the controls, therefore this work is deemed as non-conceptual design. Where the DCI is presently white (DWL) only a simple design is required and can be achieved it is authorised as part of the campaign change based upon the example diagram appended to this TI. so long as the competency criteria has been met.


Edition : 1
File Size : 1 file , 190 KB
Number of Pages : 6
Published : 04/01/2009

History


Related products

NR NR/L3/TRK/004 ISSUE 2
Published Date: 08/26/2008
Application of West Coast Engineering Track Documents
$7.5
NR BRS-SM 5851/1/2 ISSUE A
Published Date: 01/28/1991
Apparatus Case Large Parts List for Side Panel Assembly LH & RH
$5.7
NR NR/L2/ELP/27023 ISSUE 2
Published Date: 03/02/2024
Conductor Rail Heating
$13.2
NR NR/L3/OPS/045/3.09 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.09: Level Crossing Administration
$7.5

Best-Selling Products

LPI 175
Published Date: 01/01/2008
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2008 Edition
LPI 175
Published Date: 2011
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2011 Edition
$14.7
LPI 175
Published Date: 2014
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2014 Edition
$14.7