CH-89-04-2 -- Hotel Operation Using the Computer for Energy Management PDF

CH-89-04-2 -- Hotel Operation Using the Computer for Energy Management PDF

Name:
CH-89-04-2 -- Hotel Operation Using the Computer for Energy Management PDF

Published Date:
1989

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Hotels have very dynamic operations that affect energy consumption. The lack of building management has cost U.S. hotels approximately $45 million annually in wasted energy.

Hotel operators are generally unaware of how and where energy is used throughout their hotels and what effect their operating policies have on their consumption and cost. Hotel management accounts on a daily basis for labor cost, food cost, rooms revenue, and restaurant revenue. It does not account for energy and maintenance, which can be 20% of the operating cost.

The installation of computer-based electronic controis provides not only for operation but also for monitoring of the spaces. This has provided a management tool by which the operator can determine when spaces will be occupied and conditioning required.

Further monitoring of consumption through primary and secondary metering of electric and thermal energy is another important feature. This allows the operator to have real-time information and a reporting system from which management can assess the quality of the operation.

This paper discusses the virtues associated with an electronic computer-managed system.


File Size : 1 file , 770 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 4
Product Code(s) : D-24566
Published : 1989

History


Related products


Best-Selling Products

JIS A 0005:1966
Published Date: 01/01/1966
Standard nominal size of opening components for buildings
$25.5
JIS A 0007:1967
Published Date: 01/01/1967
Standard nominal size of steel framed wall component for buildings
$14.1
JIS A 0008:1967
Published Date: 01/01/1967
Standard nominal size of steel framed roof component for buildings
$11.7
JIS A 0012:1980
Published Date: 01/01/1980
Modular co-ordination -- Sizes of sanitary unit for dwellings
$15.3
JIS A 0015:1976
Published Date: 01/01/1976
Modular co-ordinating sizes of piping unit for dwellings
$12.9
JIS A 0016:1979
Published Date: 01/01/1979
Modular coordination-coordinating size of opening for built-in appliances in storage furniture
$19.2