AWS B2.1-1-201 PDF

AWS B2.1-1-201 PDF

Name:
AWS B2.1-1-201 PDF

Published Date:
01/01/1996

Status:
[ Revised ]

Description:

Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), As-Welded Condition, (Primarily Pipe Applications)

Publisher:
American Welding Society

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
aws-b2-1-1-201_2735461

Choose Document Language:
94.80 €
Need Help?

The data to support this Standard Welding Procedure Specification (WPS) have been derived from the above listed Procedure Qualification Records (PQRs) which were reviewed and validated under the auspices of the Welding Research Council. This Standard WPS is not valid using conditions and variables outside the ranges listed. The American Welding Society considers that this Standard WPS presents information for producing an acceptable weld using the conditions and variables listed. The user needs a significant knowledge of welding and accepts full responsibility for the performance of the weld and for providing the engineering capability, qualified personnel, and proper equipment to implement this Standard WPS.

Abstract

This standard contains the essential welding variables for carbon steel in the thickness range of 1/8 through 3/4 inch, using manual shielded metal arc welding with E6010 (vertical uphill) followed by E7018 (vertical uphill). It cites the base metals and operating conditions necessary to make the weldment, the filler metal specifications, and the allowable joint designs for fillet and groove welds. This WPS was developed primarily for pipe applications.


ANSI : ANSI Approved
Edition : 96
File Size : 1 file , 540 KB
Number of Pages : 23
Published : 01/01/1996

History

AWS B2.1-1-201
Published Date: 01/01/2019
Standard Welding Procedure Specification (SWPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1, Group 1 or 2), 1/8 inch [3 mm] through 3/4 inch [19 mm] Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), in the As-Welded Condition, Primarily Pipe Applications
98.40 €
AWS B2.1-1-201
Published Date: 01/01/1996
Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), As-Welded Condition, Primarily Pipe Applications
94.80 €
AWS B2.1-1-201
Published Date: 01/01/1996
Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), As-Welded Condition, (Primarily Pipe Applications)
94.80 €

Related products

AWS EG4.0
Published Date: 01/01/1996
Guide for the Training and Qualification of Welding Personnel Level III - Expert Welder
14.70 €
AWS B5.2
Published Date: 01/01/2018
Specification for the Training, Qualification, and Company Certification of Welding Inspector Specialists and Welding Inspector Assistants
22.80 €
AWS B5.15
Published Date: 01/01/2010
Specification for the Qualification of Radiographic Interpreters
21.60 €
AWS D11.2
Published Date: 01/01/1989
Guide for Welding Iron Castings
37.20 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €