AWWA ACE90104 PDF

AWWA ACE90104 PDF

Name:
AWWA ACE90104 PDF

Published Date:
01/01/1990

Status:
Active

Description:

Operational Characteristics of an Entrapped Microbial Denitrification Process

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
awwa-ace90104_230185

Choose Document Language:
7.20 €
Need Help?
Immobilized denitrifying cells via entrapping method were employed to treat groundwater containing 50 mg NO3-N/l. Both calcium-alginate and calcium-aluminum-alginate beads were studied as carriers for denitrifying cells. It was found that these entrapped microbial reactor columns could achieve high levels of nitrate removal provided pH and carbon-to-nitrogen ratio are properly controlled. Calcium concentrations in excess of 100 mg/l in raw water help stabilize the alginate beads. Denitrification columns packed with calcium-aluminum- alginate beads exhibit improved effluent turbidity.
File Size : 1 file
ISBN(s) : 0898675561
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 01/01/1990

History


Related products

AWWA ACE90108
Published Date: 01/01/1990
The San Diego Aquaculture Reuse Facility Health Effects Study
7.20 €
AWWA ACE90091
Published Date: 01/01/1990
Ozone Application in Europe
7.20 €
AWWA ACE90076
Published Date: 01/01/1990
Legislative and Regulatory Development: The Board Role in Formulating and Monitoring Strategies for Success
7.20 €
AWWA ACE90071
Published Date: 01/01/1990
Improved Efficiency Through Reduced Crew Size
7.20 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €