AWWA G510-21 PDF

AWWA G510-21 PDF

Name:
AWWA G510-21 PDF

Published Date:
04/01/2021

Status:
Active

Description:

Standard for Wastewater Treatment Plant Operations and Management

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$42
Need Help?

This standard describes the essential or critical requirements for the effective operation and management of a wastewater treatment plant.


ANSI : ANSI Approved
File Size : 1 file , 3 MB
ISBN(s) : 9781613006146
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 32
Published : 04/01/2021

History

AWWA G510-21
Published Date: 04/01/2021
Standard for Wastewater Treatment Plant Operations and Management
$42
AWWA G510-13
Published Date: 02/01/2014
Standard for Wastewater Treatment Plant Operations and Management
$42

Related products

AWWA C502-18
Published Date: 10/24/2018
Dry-Barrel Fire Hydrants
$42
AWWA C504-23
Published Date: 08/01/2023
Rubber-Seated Butterfly Valves
$42
AWWA C508-17
Published Date: 06/01/2017
Swing-Check Valves for Waterworks Service, 2-In. Through 48-In. (50-mm Through 1200-mm) NPS
$42
AWWA C561-21
Published Date: 01/01/2022
Fabricated Stainless Steel Slide Gates
$42

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138