AWWA WQTC50456 PDF

AWWA WQTC50456 PDF

Name:
AWWA WQTC50456 PDF

Published Date:
01/01/1999

Status:
Active

Description:

Clarification and Filtration Performance for Removals of Giardia and Cryptosporidium

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
BHC Company (BHC), a subsidiary of Aquarion Company is the public water supply company for more than 500,000 customers in 24 cities and towns in Fairfield, New Haven, and Litchfield Counties of Connecticut. BHC operates six surface water treatment plants including three dissolved air flotation (DAF) plants and two lamella sedimentation plants. The State of Connecticut has, to this date, given BHC only 2 log Giardia removal credit for its DAF plants. Because of this and also the need to collect Cryptosporidium removal data for the IESWTR, the research described in this paper examines Giardia and Cryptosporidium removal data for DAF treatment compared to lamella sedimentation. The objectives of the paper are: to compare performance of lamella sedimentation to DAF; to examine overall performance of clarification by lamella sedimentation or DAF plus dual media filtration; and, to examine seasonal effects of water temperature on performance. Includes 10 references, tables, figures.
Edition : Vol. - No.
File Size : 1 file , 300 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 01/01/1999

History


Related products

AWWA WQTC50513
Published Date: 01/01/1999
Achieving Total Coliform MCLG Zero in a Large-Scale Chloraminated Distribution System
$7.2
AWWA WQTC50518
Published Date: 01/01/1999
Integrated Optimization of Bromate Formation and Cryptosporidium parvum Oocyst Control in Batch and Flow-Through Ozone Contactors
$7.2
AWWA WQTC50466
Published Date: 01/01/1999
Coliforms in Biofilms: An Overview
$7.2
AWWA WQTC50397
Published Date: 01/01/1999
Is Electrocoagulation a Viable Alternative to Conventional Coagulation?
$7.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138