Publisher : NR

NR NR/L3/OPS/045/3.10 ISSUE 1 PDF

National Operating Procedure (NOP) 3.10: Isolations, Loss of Power or Damage to Third Rail Equipment

Document status: [ Active ]

$19.00
NR NR/L3/OPS/045/3.11 ISSUE 2 PDF

National Operating Procedure (NOP) 3.11: Electrical Isolations AC (OLE)

Document status: [ Active ]

$25.00
NR NR/L3/OPS/045/3.12 ISSUE 1 PDF

National Operating Procedure (NOP) 3.12: Wrong Routing Incidents - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Document status: [ Not for New Design ]

$19.00
NR NR/L3/OPS/045/3.12 ISSUE 2 PDF

National Operating Procedure (NOP) 3.12: Wrong Routing Incidents

Document status: [ Active ]

$19.00
NR NR/L3/OPS/045/3.13 ISSUE 1 PDF

National Operating Procedure (NOP) 3.13: Assistance for Disabled, Stranded and Failed Trains (Railway Operational Code)

Document status: [ Active ]

$25.00
NR NR/L3/OPS/045/3.14 ISSUE 1 PDF

National Operating Procedure (NOP) 3.14: Station Stopping Incidents

Document status: [ Active ]

$19.00
NR NR/L3/OPS/045/3.15 ISSUE 2 PDF

National Operating Procedure (NOP) 3.15: Defective On-Train Equipment

Document status: [ Active ]

$25.00
NR NR/L3/OPS/045/3.16 ISSUE 1 PDF

National Operating Procedure (NOP) 3.16: Train Door Incidents

Document status: [ Active ]

$19.00
NR NR/L3/OPS/045/3.17 ISSUE 2 PDF

National Operating Procedure (NOP) 3.17: Weather Arrangements

Document status: [ Revised ]

$62.00
NR NR/L3/OPS/045/3.17 ISSUE 3 PDF

National Operating Procedure (NOP) 3.17: Weather Arrangements

Document status: [ Active ]

$62.00