CISPR CISPR/TR 16-4-1 Ed. 2.0 en:2009 PDF

CISPR CISPR/TR 16-4-1 Ed. 2.0 en:2009 PDF

Name:
CISPR CISPR/TR 16-4-1 Ed. 2.0 en:2009 PDF

Published Date:
02/23/2009

Status:
Active

Description:

Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-1: Uncertainties, statistics and limit modelling - Uncertainties in standardized EMC tests

Publisher:
International Special Committee on Radio Interference

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
cispr-cispr-tr-16-4-1-ed-2-0-en-2009_1654566

Choose Document Language:
112.50
Need Help?
CISPR/TR 16-4-1:2009 gives guidance on the treatment of uncertainties to those who are involved in the development or modification of CISPR electromagnetic compatibility (EMC) standards. In addition, this part provides useful background information for those who apply the standards and the uncertainty aspects in practice. The objectives of this part are to:
a) identify the parameters or sources governing the uncertainty associated with the statement that a given product complies with the requirement specified in a CISPR recommendation. This uncertainty will be called "standards compliance uncertainty";
b) give guidance on the estimation of the magnitude of the standards compliance uncertainty;
c) give guidance for the implementation of the standards compliance uncertainty into the compliance criterion of a CISPR standardised compliance test.
As such, this part can be considered as a handbook that can be used by standards writers to incorporate and harmonise uncertainty considerations in existing and future CISPR standards. This part also gives guidance to regulatory authorities, accreditation bodies and test engineers to judge the performance quality of an EMC test-laboratory carrying out CISPR standardised compliance tests. The uncertainty considerations given in this part can also be used as guidance when comparing test results (and their uncertainties) obtained by using different alternative test methods. The uncertainty of a compliance test also relates to the probability of occurrence of an electromagnetic interference (EMI) problem in practice. This aspect is recognized and introduced briefly in this part. However, the problem of relating uncertainties of a compliance test to the occurrence of EMI in practice is not considered within the scope of this part. The scope of this part is limited to all the relevant uncertainty considerations of a standardized EMC compliance test. This second edition of CISPR 16-4-1 cancels and replaces the first edition published in 2003, and its Amendments 1 (2004) and 2 (2007). It constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition. The provisions available for application of uncertainties in the determination of the compliance criterion are explained more generally and a procedure is added for re-testing an approved EUT by another test house.
Edition : 2.0
File Size : 1 file , 1.8 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 117
Published : 02/23/2009

History

CISPR CISPR/TR 16-4-1 Ed. 2.0 en:2009
Published Date: 02/23/2009
Specification for radio disturbance and immunity measuring apparatus and methods - Part 4-1: Uncertainties, statistics and limit modelling - Uncertainties in standardized EMC tests
112.50 €

Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €