FORD WSE-M8G244-A2 PDF

FORD WSE-M8G244-A2 PDF

Name:
FORD WSE-M8G244-A2 PDF

Published Date:
01/01/2012

Status:
[ Inactive ]

Description:

GASKET, STEEL CORE, COMPRESSED NON-ASBESTOS NON-CELLULOSE SHEET NBR BINDER ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-wse-m8g244-a2_2797796

Choose Document Language:
9.00 €
Need Help?
INACTIVE FOR NEW DESIGN

The material defined by this specification consists of a non-asbestos non-cellulose sheet with a nitrile rubber binder secured equally on both sides of a low carbon steel core.


Edition : 12
File Size : 1 file , 27 KB
Number of Pages : 4
Published : 01/01/2012

History

FORD WSE-M8G244-A2
Published Date: 01/01/2012
GASKET, STEEL CORE, COMPRESSED NON-ASBESTOS NON-CELLULOSE SHEET NBR BINDER ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSE-M8G244-A2
Published Date: 04/21/1997
GASKET, STEEL CORE, COMPRESSED NON-ASBESTOS NON-CELLULOSE SHEET NBR BINDER
9.00 €

Related products

FORD M1C157-A
Published Date: 12/01/1991
GREASE - HIGH TEMPERATURE WATER RESISTANT - NO. 2 GRADE ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSK-M4D817-A
Published Date: 01/19/2010
PERFLUORO ALKOXY (PFA) COPOLYMER MOLDING COMPOUND ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSB-M98D31-A1
Published Date: 06/15/2022
LAMINATE, POLYVINYL CHLORIDE + ABS BLEND (PVC+ABS) OR POLYVINYL CHLORIDE (PVC) SKIN/POLYPROPYLENE (PP) FOAM, LOW PRESSURE MOLDING ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSS-M2P188-C1
Published Date: 10/10/2023
PAINT PERFORMANCE, PLASTIC SUBSTRATES, INTERIOR ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €