FORD WSF-M3G215-A PDF

FORD WSF-M3G215-A PDF

Name:
FORD WSF-M3G215-A PDF

Published Date:
02/08/2006

Status:
[ Active ]

Description:

TAPE, TWO SIDED PRESSURE SENSITIVE ADHESIVE FILM, THERMALLY CONDUCTIVE ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-wsf-m3g215-a_2861737

Choose Document Language:
9.00 €
Need Help?

The material defined by this specification is a two sided acrylic based pressure sensitive, thermally conductive, adhesive film tape protected with a polyester film release liner on one side.

 


Edition : 06
File Size : 1 file , 72 KB
Number of Pages : 3
Published : 02/08/2006

History

FORD WSF-M3G215-A
Published Date: 02/08/2006
TAPE, TWO SIDED PRESSURE SENSITIVE ADHESIVE FILM, THERMALLY CONDUCTIVE ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSF-M3G215-A
Published Date: 03/31/1993
TAPE, TWO SIDED PRESSURE SENSITIVE ADHESIVE FILM, THERMALLY CONDUCTIVE
9.00 €

Related products

FORD WSS-M1H832-A
Published Date: 03/17/2003
FABRIC, WAFFLE PATTERN, WOVEN JACQUARD, UNLAMINATED ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSS-M1H1270-A11
Published Date: 04/03/2017
FABRIC, INROAD PATTERN, FLAT WOVEN, 100% VIRGIN WITH SOIL REPELLANT ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD FLTM BN 108-07
Published Date: 03/14/2006
RESISTANCE TO SNAGGING OF TRIM MATERIALS
9.00 €
FORD SQ-M2C9003-AA
Published Date: 05/25/2004
LUBRICANT, HYPOID GEAR - SAE 90 5% SULPHUR PHOSPHORUS ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €