FORD WSK-M2D416-A PDF

FORD WSK-M2D416-A PDF

Name:
FORD WSK-M2D416-A PDF

Published Date:
09/21/2004

Status:
[ Inactive ]

Description:

POLYURETHANE (PUR) FOAM, MOLDED HIGH RESILIENCE ***TO BE USED WITH FORD WSS-M99P1111-A***

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-wsk-m2d416-a_2854212

Choose Document Language:
9.00
Need Help?
INACTIVE FOR NEW DESIGN, USE FORD WSB-M2D402-A3

The material defined by this specification is a cold cured, molded, high resilience polyurethane foam.


Edition : 06
File Size : 1 file , 110 KB
Number of Pages : 4
Published : 09/21/2004

History

FORD WSK-M2D416-A
Published Date: 09/21/2004
POLYURETHANE (PUR) FOAM, MOLDED HIGH RESILIENCE ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSK-M2D416-A
Published Date: 09/21/2004
POLYURETHANE (PUR) FOAM, MOLDED HIGH RESILIENCE ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSK-M2D416-A
Published Date: 04/05/1994
POLYURETHANE (PUR) FOAM, MOLDED, HIGH RESILIENCE
9.00 €

Related products

FORD WSS-M2C948-A
Published Date: 01/03/2024
OIL, ENGINE, INITIAL FILL SAE 5W-20 ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WFPP001
Published Date: 06/30/2014
UTILITY FASTENER DRAWING REQUIREMENTS
9.00 €
FORD WSS-M96D25-A3
Published Date: 01/19/2023
HOSE, AIR CONDITIONING REFRIGERANT (NYLON 6 BARRIER) RESISTANT, MEDIUM PRESSURE ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSD-M1H667-A
Published Date: 11/19/2008
FABRIC, PALETTE PATTERN, WOVEN JACQUARD, UNLAMINATED ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €